How to Prevent Cracking in Your Concrete Driveway

Rule #1. Use the right amount of water

Many homeowners and inexperienced contractors mistake adding too much water to the dry concrete mix to facilitate mixing. Too much water will result in brittle concrete that is prone to cracking. Even one additional quart of water can reduce strength by up to 40 percent. Wet concrete should be thoroughly saturated but not watery when adequately combined. It’s too wet when it’s damp and sloshes about in the mixer or wheelbarrow. Concrete that crumbles is too dry. To get the desired consistency for the mix, you will need around 3 quarts of water. If it’s too dry, add a pinch more water. If it’s too wet, add a tiny bit more dry concrete. It should feel like oatmeal.

Rule #2. Firmly Pack the Base

A compacted base is required before you mix concrete to construct a patio or driveway slab. Assume the foundation beneath the slab isn’t compressed. In that scenario, it may settle later and create a void beneath the slab, eventually causing fractures. The best fill type is class 5 base material or gravel because it is easy to compact. You can use a tamper to press down on the material three to four inches, so it is level.

Rule #3. Steel Reinforcements

Concrete is a potent substance on its own, but adding steel reinforcement to it makes it even more durable. Attaching rebar in a grid pattern with the bars approximately two feet apart will do. You may add wire mesh to boost strength and minimize fractures for smaller tasks, such as walkways and patios. It does not have to be difficult to add extra support. Think outside the box if you don’t have a rebar or wire mesh. Just make sure the reinforcement material is in the middle of the slab when the project ends.

Rule #4. Create control joints

Even if you cure your concrete slowly, a big slab such as a patio may fracture if the temperature shifts drastically. The hydration procedure consumes water. Slabs will eventually crack as a result of natural soil movement. This is why control joints are so important. These planned vulnerable areas are sliced into the slab down to a quarter of its depth to anticipate and direct any future fractures. The odds are that any damage will occur in these areas, which are the weakest parts of the structure.

The three ways to make a joint are as follows.

1. You can mold them in liquid concrete with a grooving tool.

2. During the pouring procedure, you may use flexible wood fiber joint expansion strips.

3. You may cut them into the slab the day after pouring with a circular saw equipped with a concrete blade.

The most effective spacing between joints is 2.5 times the planned thickness. Therefore, you should multiply the intended depth of your driveway by 2.5 to determine the maximum distance between joints. For example, if a driveway is 6 inches deep, multiply six by 2.5 to get a length of 15 feet between joints. If you place them closer together, you might use the smaller slabs for more crack protection. You may also break down the big slabs into smaller pieces perpendicular to each other. Keep an eye on the control joints for any fractures after a few months. If cracks have appeared, apply an excellent sealant to them. The type of excavation you utilize influences the durability of your foundation. When digging, focus only on the earth and a few inches of gravel required to achieve the planned depth. This will assist in preventing too many fractures in the ground. If you want to use a four-inch-thick slab for your concrete base, start by digging down seven inches. Then, add three inches of sand to the forms before pouring. Do not dig too deep and then refill it with soil because the soil will settle over time and cause the slab to fracture.

Rule #5. Allow the Slab to Cure Fully

Subsequent days to the pour are critical for a crack-free surface because concrete takes 28 days to cure fully. Cement (the binding element in a mix) gradually cures and must be kept wet to attain its maximum strength. When moisture evaporates slowly, concrete is less prone to fracture. Spray your project with water several times each day for the first week after it’s finished if you want it to be more durable. The hotter and dryer the climate, the more you spray the fresh pour.

You can save time by eliminating the need to water by adding an acrylic sealant to the mixing water before combining it with the concrete. It not only makes curing easier, but it also protects the driveway from dirt, oil, and other impurities.

If it gets cold, cover the brand new slab with an insulating blanket in case it goes below 50 degrees. You may also utilize polyethylene sheeting that is at least four or five millimeters thick to cover the surface. A layer of insulation will keep the new project from becoming too chilly. Cold might damage its interior structure and cause future cracking. If you have to cover the area to protect it from the cold, don’t uncover it to spray it down. Wait until temperatures are above 50 degrees before exposing and spraying. Spraying and covering the area after a week is no longer necessary. It is then strong enough to resist extreme temperatures.

Thomas & Son